Analyzing the Impact of Challenges in Prefabricated Building Construction Supply Chains
by Rishabh Rastogi, Sushil Kumar Solanki * , Virendra Kumar Paul
School of Planning and Architecture, New Delhi, 110002, India
* Author to whom correspondence should be addressed.
Journal of Engineering Research and Sciences, Volume 1, Issue 5, Page # 71-78, 2022; DOI: 10.55708/js0105008
Keywords: Supply Chain Challenges, Prefabricated Construction, Relative Impact, Relationship Matrix
Received: 08 February 2022, Revised: 09 April 2022, Accepted: 10 April 2022, Published Online: 12 May 2022
APA Style:
Rastogi, R., Solanki, S. K., & Paul, V. K. (2022). Analyzing the Impact of Challenges in Prefabricated Building Construction Supply Chains. Journal of Engineering Research and Sciences, 1(5), 71–82. https://doi.org/10.55708/js0105008
Chicago/Turabian Style
Rastogi, Rishabh, Sushil Kumar Solanki, and Virendra Kumar Paul. “Analyzing the Impact of Challenges in Prefabricated Building Construction Supply Chains.” Journal of Engineering Research and Sciences 1, no. 5 (May 1, 2022): 71–82. https://doi.org/10.55708/js0105008.
IEEE Style
R. Rastogi, S. K. Solanki, and V. K. Paul, “Analyzing the Impact of Challenges in Prefabricated Building Construction Supply Chains,” Journal of Engineering Research and Sciences, vol. 1, no. 5, pp. 71–82, May 2022, doi: 10.55708/js0105008.
Across various barriers pertaining to prefabricated building construction projects, a major barrier identified by the literature was integration of various components of prefabricated building project supply chain network, including the material and human resource supply chains. The literature suggests a need of exploring this barrier of supply chain integration into its various sub factors/challenges (termed as supply chain challenges) with the perspective of prefabricated building construction supply chains. This research tries to fill this gap by analyzing three cases of existing prefabricated building construction supply chains in Indian context with different configurations, geophysical profiles and project typologies. This study gives an understanding of the relationship among supply chain challenges, the variation in their relative impact on project time and cost (within the supply chain and across the different configurations of supply chains), and the underlying causes of these variations.
- P. Behera, R.P. Mohanty, & A. Prakash, “Understanding Construction Supply Chain Management” Production Planning & Control, vol. 26, no.16, pp. 1332–1350, 2015, doi 10.1080/09537287.2015.1045953.
- Butković, L. Lovrenčić, A. Grilec, and J. Mikulic. “Supply Chain Management in the Construction Industry – A Literature Review.” International OFEL Conference on Governance, Management and Entrepreneurship, 2016: pp. 798-811.
- L. Bankvall, L. E. Bygballe, A. Dubois, & M. Jahre, “Interdependence in supply chains and projects in construction” Supply Chain Management: An International Journal, vol. 15, no. 5, pp. 385–393. 2010, doi 10.1108/13598541011068314.
- Chase, B. Richard, R. Shankar, F. Robert Jacobs, and N. J. Aquilano “Operations and Supply Management” 12th. Delhi: Tata McGraw-Hill , 2010.
- S.K Solanki, VK. Paul,”A Relative Approach for Building Service Life Prediction: A Case of an Office Building at New Delhi” International Conference on ‘Future is Urban (ICFU’21), Volume 1, Nirma University Ahmedabad, Gujarat,2021.
- Yingbo. Ji, Lin Qi, Yan Liu, Xinnan Liu, Hong Xian Li, and Yan Li 2. “Assessing and Prioritising Delay Factors of Prefabricated Concrete Building Projects in China.” Applied Sciences, vol.8, pp. 1-16, 2018.
- Wang, Zhong-Lei, Hou-Cai Shen, and Jian Zuo. “Risks in Prefabricated Buildings in China: Importance-Performance Analysis Approach.” Sustainability, vol.11, pp. 1-13,2019.
- L. Jiang,Li. Zhongfu , Li. Long, and G. Yunli. “Constraints on the Promotion of Prefabricated Construction in China.” Sustainability, vol. 10 pp. 1-17,2018.
- M. Arif, D. Bendi, A Sawhney, and K C Iyer. “State of offsite construction in India-Drivers and barriers.” Journal of Physics: Conference Series, pp. 1-8, 2012.
- A. Mills, Z. Xiaolin, and R. Reed. “Factors impeding the offsite production of housing construction in China An investigation of current practice.” Construction Management and Economics, pp.1-13, 2013.
- H. Ahmed,Impact Assessment of Construction Supply Chain Risk Changes on Project Time and Cost. Waterloo: University of Waterloo, 2017.
- R. Dasgupta, S.K. Solanki, VK. Paul,2021, Post-pandemic impact on planning of district hospitals in India International Journal of the Built Environment and Asset Management, vol.2, pp.162–182, 2021.
- Massachusetts Institute of Technology. “SC0x Course: Supply Chain Management.” Cambridge, Massachusetts : edX, 2020.
- D. Doran and M. Giannakis. “An examination of a modular supply chain: a construction sector perspective.” Supply Chain Management: An International Journal vol.16, no. 4, pp.260-270, 2011.
- E. Kapoor, S.K. Solanki, VK. Paul,2021, “Cost Benefit Analysis for Rehabilitation of Buildings: Case of Indian Medical Association, New Delhi” International Journal of Structural Engineering, 2021
- G. Briscoe, A. Dainty,S. Millett, ” Construction supply chain partnerships: skills, knowledge and attitudinal requirements.” European Journal of Purchasing & Supply Management, pp.243-255,2001.